Tuesday 27 November 2012


Week 14 S2'12

This is the final week where I have to present my project which have been done almost 1 year. My project will be assessed by Associates Professor Zulkifli Abdul Kadir Bakti (ZABK) and Madam Norhaslinawati BTE Ramli. 

I was successfully able to present my project to the accessor and I am grateful. Alhamdulillah I was able to intercept my previous scores. I am very grateful to my supervisor Mohd Azlan bin Abu due to many guiding me and providing guidance on all my mistakes. 

Week 13 S2'12

This is the final week before the Industrial day on week 14. In this week, i had prepared my project, my posters and some of my final year project stuff. I also had capture a video of my project flow and process which will be shown below :



Week 12 S2'12

On this week, i decided to test on my project which can blocked the mobile signal transmission particular on GSM network. These project been test on 3 main operators which is Maxis, Digi and Celcom. the results are as follows :




The above pictures shows that when the Development of wireless signal jammer for security application is in OFF condition..

When the Development of wireless signal jammer for security application is in ON condition, the mobile phone signal transmission will be blocked as shown below :




This shows that the Development of wireless signal jammer for security application successfully blocked the three main operators Maxis, Digi and Celcom.

By this test, I can conclude that this project meet the criteria and objectives and become a success project.


Week 11 S2'12

On this particular week, I decided to design my project box. This is to place my project in the box for my presentation on Industrial day.

This box been designed by my own for making it nice and neat. The material of this box is plastic which can easily been drilled and cut. The result is as below :


Week 10 S2'12

After a week on designing and doing my poster, this week been decided by the supervisor to do our pre-presentation. The presentation goes well and there has been some discussion on how to do a good presentation.

My RF section board has been designed and etching after a very hard week on finding the components and the etching process. Below shows the result of the circuit..

Week 9 S2'12

On this week, I had submitted my poster to my supervisor for reviewing and checking.

There are some mistakes to be done on my poster and I had repaired it and been approved by my supervisor for the presentation.


On this week also, I'm still on the design of RF section board which is the final section in my project.

Week 8 S2'12

This is the mid term holiday week. The students went back home happily after doing final exams..

On this week, I had prepared my presentation on my FYP poster which been done last two weeks.

On this week also i had finish designing and finish etching on my IF section board which is shown below:

This is final result of my IF section board..